PropertyDetail-Kansas
|
|
| Appraised Building |
$530,570 |
| Appraised Land |
$122,530 |
| Appraised Total |
$653,100 |
|
| Assessed Building |
$61,016 |
| Assessed Land |
$14,091 |
| Assessed Total |
$75,107 |
|
|
|
|
|
|
|
|
|
|
|
| 2025 |
$530,570 |
$122,530 |
$653,100 |
$61,016 |
$14,091 |
$75,107 |
| 2024 |
$521,910 |
$133,390 |
$655,300 |
$60,020 |
$15,340 |
$75,360 |
| 2023 |
$472,100 |
$127,000 |
$599,100 |
$54,292 |
$14,605 |
$68,897 |
| 2022 |
$416,880 |
$120,920 |
$537,800 |
$47,941 |
$13,906 |
$61,847 |
| 2021 |
$380,270 |
$109,930 |
$490,200 |
$43,731 |
$12,642 |
$56,373 |
|
|
|
|
|
|
|
| Installment 1 |
|
Last Paid Date: 11-24-2025 |
| 232 BOND |
0.015382 |
$577.65 |
$577.65 |
$0.00 |
| 232 SCH CAPITAL OUTLAY |
0.007707 |
$289.42 |
$289.42 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$664.82 |
$664.82 |
$0.00 |
| 232 UNIFIED |
0.018953 |
$711.75 |
$711.75 |
$0.00 |
| COMM COLLEGE |
0.007873 |
$295.66 |
$295.66 |
$0.00 |
| JO CO LIBRARY |
0.003817 |
$143.34 |
$143.34 |
$0.00 |
| JO CO PARK |
0.003023 |
$113.52 |
$113.52 |
$0.00 |
| JOHNSON CO |
0.017290 |
$649.30 |
$649.30 |
$0.00 |
| MONTICELLO CEM |
0.000035 |
$1.32 |
$1.32 |
$0.00 |
| SHAWNEE CITY |
0.023267 |
$873.76 |
$873.76 |
$0.00 |
| STATE OF KS |
0.001500 |
$56.33 |
$56.33 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 5-1-2026 |
| 232 BOND |
0.015382 |
$577.65 |
$577.65 |
$0.00 |
| 232 SCH CAPITAL OUTLAY |
0.007707 |
$289.43 |
$289.43 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$664.82 |
$664.82 |
$0.00 |
| 232 UNIFIED |
0.018953 |
$711.76 |
$711.76 |
$0.00 |
| COMM COLLEGE |
0.007873 |
$295.66 |
$295.66 |
$0.00 |
| JO CO LIBRARY |
0.003817 |
$143.34 |
$143.34 |
$0.00 |
| JO CO PARK |
0.003023 |
$113.53 |
$113.53 |
$0.00 |
| JOHNSON CO |
0.017290 |
$649.29 |
$649.29 |
$0.00 |
| MONTICELLO CEM |
0.000035 |
$1.31 |
$1.31 |
$0.00 |
| SHAWNEE CITY |
0.023267 |
$873.75 |
$873.75 |
$0.00 |
| STATE OF KS |
0.001500 |
$56.33 |
$56.33 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| TOTALS |
0.118847 |
$8,825.74 |
$8,825.74 |
$0.00 |
| Installment 1 |
|
Last Paid Date: 11-21-2024 |
| 232 BOND |
0.015786 |
$594.82 |
$594.82 |
$0.00 |
| 232 SCH CAPITAL OUTLAY |
0.007999 |
$301.40 |
$301.40 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$667.35 |
$667.35 |
$0.00 |
| 232 UNIFIED |
0.017515 |
$659.96 |
$659.96 |
$0.00 |
| COMM COLLEGE |
0.008124 |
$306.11 |
$306.11 |
$0.00 |
| JO CO LIBRARY |
0.003816 |
$143.79 |
$143.79 |
$0.00 |
| JO CO PARK |
0.003023 |
$113.91 |
$113.91 |
$0.00 |
| JOHNSON CO |
0.017286 |
$651.34 |
$651.34 |
$0.00 |
| MONTICELLO CEM |
0.000064 |
$2.41 |
$2.41 |
$0.00 |
| SHAWNEE CITY |
0.023249 |
$876.02 |
$876.02 |
$0.00 |
| STATE OF KS |
0.001500 |
$56.52 |
$56.52 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 4-24-2025 |
| 232 BOND |
0.015786 |
$594.81 |
$594.81 |
$0.00 |
| 232 SCH CAPITAL OUTLAY |
0.007999 |
$301.41 |
$301.41 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$667.35 |
$667.35 |
$0.00 |
| 232 UNIFIED |
0.017515 |
$659.97 |
$659.97 |
$0.00 |
| COMM COLLEGE |
0.008124 |
$306.12 |
$306.12 |
$0.00 |
| JO CO LIBRARY |
0.003816 |
$143.78 |
$143.78 |
$0.00 |
| JO CO PARK |
0.003023 |
$113.90 |
$113.90 |
$0.00 |
| JOHNSON CO |
0.017286 |
$651.34 |
$651.34 |
$0.00 |
| MONTICELLO CEM |
0.000064 |
$2.41 |
$2.41 |
$0.00 |
| SHAWNEE CITY |
0.023249 |
$876.02 |
$876.02 |
$0.00 |
| STATE OF KS |
0.001500 |
$56.52 |
$56.52 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| TOTALS |
0.118362 |
$8,819.26 |
$8,819.26 |
$0.00 |
| Installment 1 |
|
Last Paid Date: 12-6-2023 |
| 232 BOND |
0.017761 |
$611.84 |
$611.84 |
$0.00 |
| 232 SCH CAPITAL OUTLAY |
0.007991 |
$275.28 |
$275.28 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$640.61 |
$640.61 |
$0.00 |
| 232 UNIFIED |
0.015290 |
$526.72 |
$526.72 |
$0.00 |
| COMM COLLEGE |
0.008131 |
$280.10 |
$280.10 |
$0.00 |
| JO CO LIBRARY |
0.003812 |
$131.32 |
$131.32 |
$0.00 |
| JO CO PARK |
0.003022 |
$104.10 |
$104.10 |
$0.00 |
| JOHNSON CO |
0.017526 |
$603.75 |
$603.75 |
$0.00 |
| MONTICELLO CEM |
0.000031 |
$1.07 |
$1.07 |
$0.00 |
| SHAWNEE CITY |
0.023048 |
$793.96 |
$793.96 |
$0.00 |
| STATE OF KS |
0.001500 |
$51.67 |
$51.67 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 4-24-2024 |
| 232 BOND |
0.017761 |
$611.84 |
$611.84 |
$0.00 |
| 232 SCH CAPITAL OUTLAY |
0.007991 |
$275.28 |
$275.28 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$640.61 |
$640.61 |
$0.00 |
| 232 UNIFIED |
0.015290 |
$526.71 |
$526.71 |
$0.00 |
| COMM COLLEGE |
0.008131 |
$280.11 |
$280.11 |
$0.00 |
| JO CO LIBRARY |
0.003812 |
$131.32 |
$131.32 |
$0.00 |
| JO CO PARK |
0.003022 |
$104.10 |
$104.10 |
$0.00 |
| JOHNSON CO |
0.017526 |
$603.74 |
$603.74 |
$0.00 |
| MONTICELLO CEM |
0.000031 |
$1.06 |
$1.06 |
$0.00 |
| SHAWNEE CITY |
0.023048 |
$793.97 |
$793.97 |
$0.00 |
| STATE OF KS |
0.001500 |
$51.68 |
$51.68 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| TOTALS |
0.118112 |
$8,112.84 |
$8,112.84 |
$0.00 |
| Installment 1 |
|
Last Paid Date: 11-28-2022 |
| 232 BOND |
0.017934 |
$554.58 |
$554.58 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$572.47 |
$572.47 |
$0.00 |
| 232 UNIFIED |
0.023739 |
$734.10 |
$734.10 |
$0.00 |
| COMM COLLEGE |
0.008617 |
$266.47 |
$266.47 |
$0.00 |
| JO CO LIBRARY |
0.003815 |
$117.98 |
$117.98 |
$0.00 |
| JO CO PARK |
0.003021 |
$93.42 |
$93.42 |
$0.00 |
| JOHNSON CO |
0.017772 |
$549.57 |
$549.57 |
$0.00 |
| MONTICELLO CEM |
0.000035 |
$1.08 |
$1.08 |
$0.00 |
| SHAWNEE CITY |
0.024047 |
$743.62 |
$743.62 |
$0.00 |
| STATE OF KS |
0.001500 |
$46.38 |
$46.38 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 4-18-2023 |
| 232 BOND |
0.017934 |
$554.58 |
$554.58 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$572.47 |
$572.47 |
$0.00 |
| 232 UNIFIED |
0.023739 |
$734.09 |
$734.09 |
$0.00 |
| COMM COLLEGE |
0.008617 |
$266.47 |
$266.47 |
$0.00 |
| JO CO LIBRARY |
0.003815 |
$117.97 |
$117.97 |
$0.00 |
| JO CO PARK |
0.003021 |
$93.42 |
$93.42 |
$0.00 |
| JOHNSON CO |
0.017772 |
$549.57 |
$549.57 |
$0.00 |
| MONTICELLO CEM |
0.000035 |
$1.08 |
$1.08 |
$0.00 |
| SHAWNEE CITY |
0.024047 |
$743.62 |
$743.62 |
$0.00 |
| STATE OF KS |
0.001500 |
$46.39 |
$46.39 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| TOTALS |
0.120480 |
$7,431.33 |
$7,431.33 |
$0.00 |
| Installment 1 |
|
Last Paid Date: 11-29-2021 |
| 232 BOND |
0.018452 |
$520.10 |
$520.10 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$540.73 |
$540.73 |
$0.00 |
| 232 UNIFIED |
0.023497 |
$662.30 |
$662.30 |
$0.00 |
| COMM COLLEGE |
0.009110 |
$256.78 |
$256.78 |
$0.00 |
| JO CO LIBRARY |
0.003908 |
$110.15 |
$110.15 |
$0.00 |
| JO CO PARK |
0.003096 |
$87.27 |
$87.27 |
$0.00 |
| JOHNSON CO |
0.018564 |
$523.25 |
$523.25 |
$0.00 |
| MONTICELLO CEM |
0.000050 |
$1.41 |
$1.41 |
$0.00 |
| SHAWNEE CITY |
0.026004 |
$732.96 |
$732.96 |
$0.00 |
| STATE OF KS |
0.001500 |
$42.28 |
$42.28 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 5-5-2022 |
| 232 BOND |
0.018452 |
$520.10 |
$520.10 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$540.73 |
$540.73 |
$0.00 |
| 232 UNIFIED |
0.023497 |
$662.30 |
$662.30 |
$0.00 |
| COMM COLLEGE |
0.009110 |
$256.78 |
$256.78 |
$0.00 |
| JO CO LIBRARY |
0.003908 |
$110.16 |
$110.16 |
$0.00 |
| JO CO PARK |
0.003096 |
$87.26 |
$87.26 |
$0.00 |
| JOHNSON CO |
0.018564 |
$523.25 |
$523.25 |
$0.00 |
| MONTICELLO CEM |
0.000050 |
$1.41 |
$1.41 |
$0.00 |
| SHAWNEE CITY |
0.026004 |
$732.96 |
$732.96 |
$0.00 |
| STATE OF KS |
0.001500 |
$42.28 |
$42.28 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| TOTALS |
0.124181 |
$7,026.46 |
$7,026.46 |
$0.00 |
| Installment 1 |
|
Last Paid Date: 12-3-2020 |
| 232 BOND |
0.018433 |
$492.43 |
$492.43 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$511.29 |
$511.29 |
$0.00 |
| 232 UNIFIED |
0.023851 |
$637.16 |
$637.16 |
$0.00 |
| COMM COLLEGE |
0.009191 |
$245.54 |
$245.54 |
$0.00 |
| JO CO LIBRARY |
0.003905 |
$104.32 |
$104.32 |
$0.00 |
| JO CO PARK |
0.003093 |
$82.63 |
$82.63 |
$0.00 |
| JOHNSON CO |
0.018799 |
$502.21 |
$502.21 |
$0.00 |
| MONTICELLO CEM |
0.000025 |
$0.67 |
$0.67 |
$0.00 |
| SHAWNEE CITY |
0.026501 |
$707.96 |
$707.96 |
$0.00 |
| STATE OF KS |
0.001500 |
$40.07 |
$40.07 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| SHCCLRCRKPKY |
- |
$232.85 |
$232.85 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 4-14-2021 |
| 232 BOND |
0.018433 |
$492.43 |
$492.43 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$511.29 |
$511.29 |
$0.00 |
| 232 UNIFIED |
0.023851 |
$637.17 |
$637.17 |
$0.00 |
| COMM COLLEGE |
0.009191 |
$245.53 |
$245.53 |
$0.00 |
| JO CO LIBRARY |
0.003905 |
$104.32 |
$104.32 |
$0.00 |
| JO CO PARK |
0.003093 |
$82.63 |
$82.63 |
$0.00 |
| JOHNSON CO |
0.018799 |
$502.20 |
$502.20 |
$0.00 |
| MONTICELLO CEM |
0.000025 |
$0.67 |
$0.67 |
$0.00 |
| SHAWNEE CITY |
0.026501 |
$707.96 |
$707.96 |
$0.00 |
| STATE OF KS |
0.001500 |
$40.07 |
$40.07 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| SHCCLRCRKPKY |
- |
$232.84 |
$232.84 |
$0.00 |
| TOTALS |
0.125298 |
$7,186.24 |
$7,186.24 |
$0.00 |
| Installment 1 |
|
Last Paid Date: 12-18-2019 |
| 232 BOND |
0.019469 |
$540.26 |
$540.26 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$531.99 |
$531.99 |
$0.00 |
| 232 UNIFIED |
0.024360 |
$675.98 |
$675.98 |
$0.00 |
| COMM COLLEGE |
0.009121 |
$253.10 |
$253.10 |
$0.00 |
| JO CO LIBRARY |
0.003904 |
$108.33 |
$108.33 |
$0.00 |
| JO CO PARK |
0.003090 |
$85.74 |
$85.74 |
$0.00 |
| JOHNSON CO |
0.019036 |
$528.24 |
$528.24 |
$0.00 |
| MONTICELLO CEM |
0.000044 |
$1.22 |
$1.22 |
$0.00 |
| SHAWNEE CITY |
0.026625 |
$738.84 |
$738.84 |
$0.00 |
| STATE OF KS |
0.001500 |
$41.62 |
$41.62 |
$0.00 |
| SHCCLRCRKPKY |
- |
$232.85 |
$232.85 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| Installment 2 |
|
Last Paid Date: 3-26-2020 |
| 232 BOND |
0.019469 |
$540.25 |
$540.25 |
$0.00 |
| 232 SCH GEN |
0.020000 |
$531.99 |
$531.99 |
$0.00 |
| 232 UNIFIED |
0.024360 |
$675.97 |
$675.97 |
$0.00 |
| COMM COLLEGE |
0.009121 |
$253.10 |
$253.10 |
$0.00 |
| JO CO LIBRARY |
0.003904 |
$108.34 |
$108.34 |
$0.00 |
| JO CO PARK |
0.003090 |
$85.75 |
$85.75 |
$0.00 |
| JOHNSON CO |
0.019036 |
$528.24 |
$528.24 |
$0.00 |
| MONTICELLO CEM |
0.000044 |
$1.22 |
$1.22 |
$0.00 |
| SHAWNEE CITY |
0.026625 |
$738.83 |
$738.83 |
$0.00 |
| STATE OF KS |
0.001500 |
$41.63 |
$41.63 |
$0.00 |
| SHCCLRCRKPKY |
- |
$232.84 |
$232.84 |
$0.00 |
| SHC STORMDRG |
- |
$36.00 |
$36.00 |
$0.00 |
| TOTALS |
0.127149 |
$7,548.33 |
$7,548.33 |
$0.00 |
|
|
| 2025 |
5-1-2026 |
$4,412.87 |
2026-46187-JOCO |
| 2025 |
11-24-2025 |
$4,412.87 |
2025-205648-JOCO |
| 2024 |
4-24-2025 |
$4,409.63 |
2025-22654-JOCO |
| 2024 |
11-21-2024 |
$4,409.63 |
2024-198293-JOCO |
| 2023 |
4-24-2024 |
$4,056.42 |
2024-31904-JOCO |
| 2023 |
12-6-2023 |
$4,056.42 |
2023-227904-JOCO |
| 2022 |
4-18-2023 |
$3,715.66 |
2023-30040-JOCO |
| 2022 |
11-28-2022 |
$3,715.67 |
2022-210056-JOCO |
| 2021 |
5-5-2022 |
$3,513.23 |
2022-142655-JOCO |
| 2021 |
11-29-2021 |
$3,513.23 |
2021-207159-JOCO |
| 2020 |
4-14-2021 |
$3,593.11 |
2021-24824-JOCO |
| 2020 |
12-3-2020 |
$3,593.13 |
2020-210594-JOCO |
| 2019 |
3-26-2020 |
$3,774.16 |
2020-16209-JOCO |
| 2019 |
12-18-2019 |
$3,774.17 |
2019-326239-JOCO |
|